MEDIA INFORMATION

 
 
 
COLLECTION NAME:
NASA Kennedy Center Media Archive Collection
Record
Description:
The orbiter Discovery approaches KSC's 525-foot-high Vehicle Assembly Building (VAB) after leaving the Orbiter Processing Facility Bay 2. Once inside the VAB, Discovery will be hoisted upright into a vertical position to be mated with an orange external tank and two white solid rocket boosters. Once mated, the orbiter becomes the Space Shuttle Discovery, slated for launch on STS-91, the ninth and final docking mission with the Russian Space Station Mir. The six-member crew of STS-91 will dock with Mir and pick up Mission Specialist Andrew Thomas, Ph.D., who will have been on Mir about four months, to return him to Earth. STS-91 is scheduled to launch June 2 at about 6:04 p.m. EDT
Release Date:
04/27/1998
Photo Credit:
NASA or National Aeronautics and Space Administration
Release:
National Aeronautics and Space Administration John F. Kennedy Space Center Kennedy Space Center, Florida 32899
facet_who:
Andrew Thomas
facet_what:
Earth
facet_where:
Florida
facet_when:
04-27-1998
facet_when_year:
1998
Photo Number:
KSC-98PC-536
UID:
SPD-KSCMA-KSC-98PC-536
original url:

The orbiter Discovery approaches KSC's 525-foot-high Vehicle Assembly Building (VAB) after...

The orbiter Discovery approaches KSC's 525-foot-high Vehicle Assembly Building (VAB) after leaving the Orbiter Processing Facility Bay 2. Once inside the VAB, Discovery will be hoisted upright into a vertical position to be mated with an orange external tank and two white solid rocket boosters. Once mated, the orbiter becomes the Space Shuttle Discovery, slated for launch on STS-91, the ninth and final docking mission with the Russian Space Station Mir. The six-member crew of STS-91 will dock with Mir and pick up Mission Specialist Andrew Thomas, Ph.D., who will have been on Mir about four months, to return him to Earth. STS-91 is scheduled to launch June 2 at about 6:04 p.m. EDT