KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis sits on launch Pad 39A waiting for the rotating service structure, pictured at left, to be moved into place for final launch preparations. Liftoff of Atlantis on mission STS-101 is scheduled for April 17 at 7:03 p.m. EDT. STS-101 is a logistics and resupply mission for the International Space Station, to restore full redundancy to the International Space Station power system in preparation for the arrival of the next pressurized module, the Russian-built Zvezda
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis sits on launch Pad 39A waiting for the rotating service structure to be moved into place for final launch preparations. A small section of the fixed service structure is seen on the left. Liftoff of Atlantis on mission STS-101 is scheduled for April 17 at 7:03 p.m. EDT. STS-101 is a logistics and resupply mission for the International Space Station, to restore full redundancy to the International Space Station power system in preparation for the arrival of the next pressurized module, the Russian-built Zvezda
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis, atop the mobile launcher platform and crawler-transporter, sits on launch Pad 39A with the Atlantic Ocean in the background after having traveled 3.4 miles from the Vehicle Assembly Building. Liftoff of Atlantis on mission STS-101 is scheduled for April 17 at 7:03 p.m. EDT. STS-101 is a logistics and resupply mission for the International Space Station, to restore full redundancy to the International Space Station power system in preparation for the arrival of the next pressurized module, the Russian-built Zvezda
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
Seen from across the backwaters of the Indian River Lagoon, the Space Shuttle Atlantis, atop the mobile launcher platform and crawler-transporter, nears Launch Pad 39A at 1 mph. The crawler-transporter takes about five hours to cover the 3.4 miles from the Vehicle Assembly Building to the launch pad. The crawler-transporter carries its cargo at 1 mph, taking about five hours to cover the 3.4 miles from the Vehicle Assembly Building to the launch pad. A leveling system on the crawler-transporter keeps the top of the Space Shuttle vertical, especially negotiating the ramp leading to the launch pads and when it is raised and lowered on pedestals at the pad. Liftoff of Atlantis on mission STS-101 is scheduled for April 17 at 7:03 p.m. EDT. STS-101 is a logistics and resupply mission for the International Space Station, to restore full redundancy to the International Space Station power system in preparation for the arrival of the next pressurized module, the Russian-built Zvezda
Seen from across the ba...
No copyright protection...
NASA or National Aerona...
 
Just after departing the Vehicle Assembly Building, the Space Shuttle Atlantis aboard the crawler-transporter wends its way to Launch Pad 39A. The crawler-transporter carries its cargo at 1 mph, taking about five hours to cover the 3.4 miles from the Vehicle Assembly Building to the launch pad. A leveling system on the crawler-transporter keeps the top of the Space Shuttle vertical, especially negotiating the ramp leading to the launch pads and when it is raised and lowered on pedestals at the pad. Liftoff of Atlantis on mission STS-101 is scheduled for April 17 at 7:03 p.m. EDT. STS-101 is a logistics and resupply mission for the International Space Station, to restore full redundancy to the International Space Station power system in preparation for the arrival of the next pressurized module, the Russian-built Zvezda
Just after departing th...
No copyright protection...
NASA or National Aerona...
 
Inside the Vehicle Assembly Building, Space Shuttle Atlantis stands ready for rollout to Launch Pad 39A. It sits on top of a Mobile Launcher Platform (MLP), a two-story steel structure 25 feet high, which supports and restrains the Shuttle during assembly, transit and while at the pad. The MLP weighs 8.23 million pounds. The entire configuration of Shuttle plus MLP is moved to the pad aboard a crawler-transporter. Liftoff of Atlantis on mission STS-101 is scheduled for April 17 at 7:03 p.m. EDT. STS-101 is a logistics and resupply mission for the International Space Station, to restore full redundancy to the International Space Station power system in preparation for the arrival of the next pressurized module, the Russian-built Zvezda
Inside the Vehicle Asse...
No copyright protection...
NASA or National Aerona...
 
A wide-angle view of the Space Shuttle Atlantis as it stands ready inside the Vehicle Assembly Building for rollout to Launch Pad 39A. It sits on top of a Mobile Launcher Platform (MLP), a two-story steel structure 25 feet high, which supports and restrains the Shuttle during assembly, transit and while at the pad. The MLP weighs 8.23 million pounds. The entire configuration of Shuttle plus MLP is moved to the pad aboard a crawler-transporter. Liftoff of Atlantis on mission STS-101 is scheduled for April 17 at 7:03 p.m. EDT. STS-101 is a logistics and resupply mission for the International Space Station, to restore full redundancy to the International Space Station power system in preparation for the arrival of the next pressurized module, the Russian-built Zvezda
A wide-angle view of th...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. -- The Space Shuttle Atlantis, atop the mobile launcher platform and crawler-transporter, begins the climb up the ramp to Launch Pad 39A. The crawler-transporter carries its cargo at 1 mph, taking about five hours to cover the 3.4 miles from the Vehicle Assembly Building to the launch pad. A leveling system on the crawler-transporter keeps the top of the Space Shuttle vertical, especially negotiating the ramp leading to the launch pads and when it is raised and lowered on pedestals at the pad. Liftoff of Atlantis on mission STS-101 is scheduled for April 17 at 7:03 p.m. EDT. STS-101 is a logistics and resupply mission for the International Space Station, to restore full redundancy to the International Space Station power system in preparation for the arrival of the next pressurized module, the Russian-built Zvezda
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
Passing by a palm tree, the Space Shuttle Atlantis aboard the crawler-transporter makes its way to Launch Pad 39A. The crawler-transporter carries its cargo at 1 mph, taking about five hours to cover the 3.4 miles from the Vehicle Assembly Building to the launch pad. A leveling system on the crawler-transporter keeps the top of the Space Shuttle vertical, especially negotiating the ramp leading to the launch pads and when it is raised and lowered on pedestals at the pad. Liftoff of Atlantis on mission STS-101 is scheduled for April 17 at 7:03 p.m. EDT. STS-101 is a logistics and resupply mission for the International Space Station, to restore full redundancy to the International Space Station power system in preparation for the arrival of the next pressurized module, the Russian-built Zvezda
Passing by a palm tree,...
No copyright protection...
NASA or National Aerona...
 