MEDIA INFORMATION

 
 
 
COLLECTION NAME:
NASA Kennedy Center Media Archive Collection
Record
Description:
KENNEDY SPACE CENTER, Fla. -- At Launch Pad 39A, the payload canister with the Integrated Truss Structure Z1 inside arrives at the spot under the Rotating Service Structure where the canister can be lifted to the Payload Changeout Room. There the Z1 truss will be removed and later transferred to Space Shuttle Discovery?s payload bay. Discovery is at right, sitting atop the Mobile Launcher Platform. The Z1 truss is the first of 10 that will become the backbone of the International Space Station, eventually stretching the length of a football field. Along with its companion payload, the third Pressurized Mating Adapter, the Z1 is scheduled to be launched aboard Discovery Oct. 5 at 9:38 p.m. EDT
Release Date:
09/13/2000
Photo Credit:
NASA or National Aeronautics and Space Administration
Release:
National Aeronautics and Space Administration John F. Kennedy Space Center Kennedy Space Center, Florida 32899
facet_what:
International Space Station (ISS)
facet_where:
Florida
facet_when:
09-13-2000
facet_when_year:
2000
Photo Number:
KSC-00PP-1352
UID:
SPD-KSCMA-KSC-00PP-1352
original url:

KENNEDY SPACE CENTER, Fla. -- At Launch Pad 39A, the payload canister with the Integrated ...

KENNEDY SPACE CENTER, Fla. -- At Launch Pad 39A, the payload canister with the Integrated Truss Structure Z1 inside arrives at the spot under the Rotating Service Structure where the canister can be lifted to the Payload Changeout Room. There the Z1 truss will be removed and later transferred to Space Shuttle Discovery?s payload bay. Discovery is at right, sitting atop the Mobile Launcher Platform. The Z1 truss is the first of 10 that will become the backbone of the International Space Station, eventually stretching the length of a football field. Along with its companion payload, the third Pressurized Mating Adapter, the Z1 is scheduled to be launched aboard Discovery Oct. 5 at 9:38 p.m. EDT