MEDIA INFORMATION

 
 
 
COLLECTION NAME:
NASA Kennedy Center Media Archive Collection
Record
Description:
KENNEDY SPACE CENTER, FLA. - In the transfer aisle of NASA Kennedy Space Center's Vehicle Assembly Building, the newly delivered external tank is suspended vertically just above the floor. Designated ET-119, the 154-foot tank will be lifted into a checkout cell for further work. The tank, which will launch space shuttle Discovery on mission STS-121, will fly with many major safety changes, including the removal of the protuberance air load ramps. A large piece of foam from a ramp came off during the last shuttle launch in July 2005. The ramps were removed to eliminate a potential source of damaging debris to the space shuttle. The next launch of Discovery is scheduled for May 2006. Photo credit: NASA/Jim Grossmann
Release Date:
03/02/2006
Photo Credit:
NASA or National Aeronautics and Space Administration
Release:
National Aeronautics and Space Administration John F. Kennedy Space Center Kennedy Space Center, Florida 32899
facet_what:
Space Shuttle Orbiter
facet_where:
Florida
facet_when:
03-02-2006
facet_when_year:
2005
Photo Number:
KSC-06PD-0422
UID:
SPD-KSCMA-KSC-06PD-0422
original url:

KENNEDY SPACE CENTER, FLA. - In the transfer aisle of NASA Kennedy Space Center's Vehicle ...

KENNEDY SPACE CENTER, FLA. - In the transfer aisle of NASA Kennedy Space Center's Vehicle Assembly Building, the newly delivered external tank is suspended vertically just above the floor. Designated ET-119, the 154-foot tank will be lifted into a checkout cell for further work. The tank, which will launch space shuttle Discovery on mission STS-121, will fly with many major safety changes, including the removal of the protuberance air load ramps. A large piece of foam from a ramp came off during the last shuttle launch in July 2005. The ramps were removed to eliminate a potential source of damaging debris to the space shuttle. The next launch of Discovery is scheduled for May 2006. Photo credit: NASA/Jim Grossmann