REFINE 

Browse All : Images from 01-30-2002

1-14 of 14
KENNEDY SPACE CENTER, FLA. - STS-109 Mission Specialist Nancy Currie gets a suit check during Terminal Countdown Demonstration Test activities. She and other crew members - Commander Scott Altman, Pilot Duane Carey, Payload Commander John Grunsfeld and Mission Specialists James Newman, Richard Linnehan and Michael Massimino - are at Kennedy for the TCDT that also includes emergency egress training and a simulated countdown. Columbia is scheduled to be launched Feb. 28 on mission STS-109, a Hubble Servicing Mission. The goal of the mission is to replace Solar Array 2 with Solar Array 3, replace the Power Control Unit, remove the Faint Object Camera and install the ACS, install the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and install New Outer Blanket Layer insulation. The launch will be the first for Columbia after returning from California where it underwent extensive maintenance, inspections and enhancements. More than 100 upgrades make Columbia safer and more reliable than ever before
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. -- STS-109 Mission Specialist Michael Massimino relaxes during a suit check, part of Terminal Countdown Demonstration Test activities. He and other crew members - Commander Scott Altman, Pilot Duane Carey, Payload Commander John Grunsfeld and Mission Specialists Nancy Currie, James Newman and Richard Linnehan - are at Kennedy for the TCDT that also includes emergency egress training and a simulated countdown. Columbia is scheduled to be launched Feb. 28 on mission STS-109, a Hubble Servicing Mission. The goal of the mission is to replace Solar Array 2 with Solar Array 3, replace the Power Control Unit, remove the Faint Object Camera and install the ACS, install the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and install New Outer Blanket Layer insulation. The launch will be the first for Columbia after returning from California where it underwent extensive maintenance, inspections and enhancements. More than 100 upgrades make Columbia safer and more reliable than ever before
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. -- STS-109 Mission Specialist James Newman waves during suit check, which is part of Terminal Countdown Demonstration Test activities. He and other crew members - Commander Scott Altman, Pilot Duane Carey, Payload Commander John Grunsfeld and Mission Specialists Nancy Currie, Richard Linnehan and Michael Massimino - are at Kennedy for the TCDT that also includes emergency egress training and a simulated countdown. Columbia is scheduled to be launched Feb. 28 on mission STS-109, a Hubble Servicing Mission. The goal of the mission is to replace Solar Array 2 with Solar Array 3, replace the Power Control Unit, remove the Faint Object Camera and install the ACS, install the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and install New Outer Blanket Layer insulation. The launch will be the first for Columbia after returning from California where it underwent extensive maintenance, inspections and enhancements. More than 100 upgrades make Columbia safer and more reliable than ever before
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. -- STS-109 Payload Commander John Grunsfeld relaxes during suit check, which is part of Terminal Countdown Demonstration Test activities. He and other crew members - Commander Scott Altman, Pilot Duane Carey and Mission Specialists Nancy Currie, James Newman, Richard Linnehan and Michael Massimino - are at Kennedy for the TCDT that also includes emergency egress training and a simulated countdown. Columbia is scheduled to be launched Feb. 28 on mission STS-109, a Hubble Servicing Mission. The goal of the mission is to replace Solar Array 2 with Solar Array 3, replace the Power Control Unit, remove the Faint Object Camera and install the ACS, install the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and install New Outer Blanket Layer insulation. The launch will be the first for Columbia after returning from California where it underwent extensive maintenance, inspections and enhancements. More than 100 upgrades make Columbia safer and more reliable than ever before
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. - STS-109 Commander Scott Altman drives the M-113 armored personnel carrier during emergency egress training at the launch pad. He and other crew members are taking part in Terminal Countdown Demonstration Test activities, which also include a simulated launch countdown. STS-109 is a Hubble Space Telescope Servicing Mission, with goals to replace Solar Array 2 with Solar Array 3, replace the Power Control Unit, remove the Faint Object Camera and install the Advanced Camera for Surveys (ACS), install the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and install New Outer Blanket Layer insulation. The 11-day mission will require grasping the satellite with a robotic arm in order for the crew to perform the tasks during five spacewalks. Launch of STS-109 aboard Space Shuttle Columbia is scheduled for Feb. 28, 2002
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. -- STS-109 Commander Scott Altman is ready to practice driving the M-113 armored personnel carrier, part of emergency egress training at the launch pad. He and other crew members are taking part in Terminal Countdown Demonstration Test activities, which also include a simulated launch countdown. STS-109 is a Hubble Space Telescope Servicing Mission, with goals to replace Solar Array 2 with Solar Array 3, replace the Power Control Unit, remove the Faint Object Camera and install the Advanced Camera for Surveys (ACS), install the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and install New Outer Blanket Layer insulation. The 11-day mission will require grasping the satellite with a robotic arm in order for the crew to perform the tasks during five spacewalks. Launch of STS-109 aboard Space Shuttle Columbia is scheduled for Feb. 28, 2002
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. -- STS-109 Mission Specialist Richard Linnehan gets a suit check during Terminal Countdown Demonstration Test activities. He and other crew members - Commander Scott Altman, Pilot Duane Carey, Payload Commander John Grunsfeld and Mission Specialists Nancy Currie, James Newman and Michael Massimino - are at Kennedy for the TCDT that also includes emergency egress training and a simulated countdown. Columbia is scheduled to be launched Feb. 28 on mission STS-109, a Hubble Servicing Mission. The goal of the mission is to replace Solar Array 2 with Solar Array 3, replace the Power Control Unit, remove the Faint Object Camera and install the ACS, install the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and install New Outer Blanket Layer insulation. The launch will be the first for Columbia after returning from California where it underwent extensive maintenance, inspections and enhancements. More than 100 upgrades make Columbia safer and more reliable than ever before
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. - After training on the M-113 armored personnel carrier, the STS-109 crew gather for a photo. Seated on top are (left to right) Payload Commander John Grunsfeld, Commander Scott Altman and Mission Specialists Nancie Currie and James Newman; standing below are Pilot Duane Carey and Mission Specialists Richard Linnehan and Michael Massimino. The carrier is part of emergency egress training at the launch pad. The crew is taking part in Terminal Countdown Demonstration Test activities that also include a simulated countdown at the pad. STS-109 is a Hubble Space Telescope Servicing Mission, with goals to replace Solar Array 2 with Solar Array 3, replace the Power Control Unit, remove the Faint Object Camera and install the Advanced Camera for Surveys (ACS), install the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and install New Outer Blanket Layer insulation. The 11-day mission will require grasping the satellite with a robotic arm in order for the crew to perform the tasks during five spacewalks. Launch of STS-109 aboard Space Shuttle Columbia is scheduled for Feb. 28, 2002
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. - STS-109 Mission Specialist Michael Massimino is ready to practice driving the M-113 armored personnel carrier, part of emergency egress training at the launch pad. Behind him is Commander Scott Altmann. Crew members are taking part in Terminal Countdown Demonstration Test activities, which also include a simulated launch countdown. STS-109 is a Hubble Space Telescope Servicing Mission, with goals to replace Solar Array 2 with Solar Array 3, replace the Power Control Unit, remove the Faint Object Camera and install the Advanced Camera for Surveys (ACS), install the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and install New Outer Blanket Layer insulation. The 11-day mission will require grasping the satellite with a robotic arm in order for the crew to perform the tasks during five spacewalks. Launch of STS-109 aboard Space Shuttle Columbia is scheduled for Feb. 28, 2002
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. - During training on an M-113 armored personnel carrier, members of the STS-109 crew pause for this photo. From left are pictured Mission Specialist Michael Massimino, Pilot Duane Carey and Commander Scott Altman. The M-113 is part of emergency egress training at the launch pad. Crew members are taking part in Terminal Countdown Demonstration Test activities, which also include a simulated launch countdown. STS-109 is a Hubble Space Telescope Servicing Mission, with goals to replace Solar Array 2 with Solar Array 3, replace the Power Control Unit, remove the Faint Object Camera and install the Advanced Camera for Surveys (ACS), install the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and install New Outer Blanket Layer insulation. The 11-day mission will require grasping the satellite with a robotic arm in order for the crew to perform the tasks during five spacewalks. Launch of STS-109 aboard Space Shuttle Columbia is scheduled for Feb. 28, 2002
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. - STS-109 Mission Specialist Richard Linnehan is ready to practice driving the M-113 armored personnel carrier, part of emergency egress training at the launch pad. Behind him is Mission Specialist Michael Massimino. Crew members are taking part in Terminal Countdown Demonstration Test activities, which also include a simulated launch countdown. STS-109 is a Hubble Space Telescope Servicing Mission, with goals to replace Solar Array 2 with Solar Array 3, replace the Power Control Unit, remove the Faint Object Camera and install the Advanced Camera for Surveys (ACS), install the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and install New Outer Blanket Layer insulation. The 11-day mission will require grasping the satellite with a robotic arm in order for the crew to perform the tasks during five spacewalks. Launch of STS-109 aboard Space Shuttle Columbia is scheduled for Feb. 28, 2002
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. - STS-109 Mission Specialist Nancy Currie is ready to practice driving the M-113 armored personnel carrier, part of emergency egress training at the launch pad. Crew members are taking part in Terminal Countdown Demonstration Test activities, which also include a simulated launch countdown. STS-109 is a Hubble Space Telescope Servicing Mission, with goals to replace Solar Array 2 with Solar Array 3, replace the Power Control Unit, remove the Faint Object Camera and install the Advanced Camera for Surveys (ACS), install the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and install New Outer Blanket Layer insulation. The 11-day mission will require grasping the satellite with a robotic arm in order for the crew to perform the tasks during five spacewalks. Launch of STS-109 aboard Space Shuttle Columbia is scheduled for Feb. 28, 2002
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. - STS-109 Pilot Duane Carey is ready to practice driving the M-113 armored personnel carrier, part of emergency egress training at the launch pad. He and other crew members are taking part in Terminal Countdown Demonstration Test activities, which also include a simulated launch countdown. STS-109 is a Hubble Space Telescope Servicing Mission, with goals to replace Solar Array 2 with Solar Array 3, replace the Power Control Unit, remove the Faint Object Camera and install the Advanced Camera for Surveys (ACS), install the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and install New Outer Blanket Layer insulation. The 11-day mission will require grasping the satellite with a robotic arm in order for the crew to perform the tasks during five spacewalks. Launch of STS-109 aboard Space Shuttle Columbia is scheduled for Feb. 28, 2002
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. - STS-109 Payload Commander John Grunsfeld is ready to practice driving the M-113 armored personnel carrier, part of emergency egress training at the launch pad. Behind him is Mission Specialist Michael Massimino. Crew members are taking part in Terminal Countdown Demonstration Test activities, which also include a simulated launch countdown. STS-109 is a Hubble Space Telescope Servicing Mission, with goals to replace Solar Array 2 with Solar Array 3, replace the Power Control Unit, remove the Faint Object Camera and install the Advanced Camera for Surveys (ACS), install the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and install New Outer Blanket Layer insulation. The 11-day mission will require grasping the satellite with a robotic arm in order for the crew to perform the tasks during five spacewalks. Launch of STS-109 aboard Space Shuttle Columbia is scheduled for Feb. 28, 2002
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
1-14 of 14