REFINE 

Browse All : Images by Lee Morin

1-16 of 16
Warm Welcome
Warm Welcome
7/30/08
NASA
 
Year 2008
Lillie Burney Elementary School
Lillie Burney Elementar...
NASA Explorer School, L...
9/8/06
NASA/Stennis Space Cent...
 
Year 2006
Group photo of the 1996 ASCAN class
Group photo of the 1996...
 
STS-110 Crew Photo
STS-110 Crew Photo
09/13/01
 
Year 2001
Lillie Burney Elementary School
Lillie Burney Elementar...
Mississippi Rep. Percy ...
09.08.2006
Image
 
KENNEDY SPACE CENTER, FLA. -- During Terminal Countdown Demonstration Test activities, STS-110 Mission Specialist Lee Morin has his launch and entry suit checked for fit. The TCDT is held at KSC prior to each Space Shuttle flight to provide flight crews an opportunity to participate in simulated launch countdown activities. Scheduled for launch April 4, the 11-day mission will feature Shuttle Atlantis docking with the International Space Station (ISS) and delivering the S0 truss, the centerpiece-segment of the primary truss structure that will eventually extend over 300 feet.
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. -- The STS-110 crew walks out of the Operations and Checkout Building on their way to the launch pad for a simulated launch countdown. From the rear, left row, are Mission Specialists Jerry Ross and Rex Walheim, Pilot Stephen Frick; right row, Mission Specialists Steven Smith, Lee Morin and Ellen Ocho, and Commander Michael Bloomfield. The simulation is part of Terminal Countdown Demonstration Test activities. TCDT also includes emergency egress training and is held at KSC prior to each Space Shuttle flight. Scheduled for launch April 4, the 11-day mission will feature Shuttle Atlantis docking with the International Space Station (ISS) and delivering the S0 truss, the centerpiece-segment of the primary truss structure that will eventually extend over 300 feet
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. -- STS-110 Mission Specialist Jerry Ross waits his turn at driving the M-113 armored personnel carrier, part of Terminal Countdown Demonstration Test activities. In the background, right, is Mission Specialist Lee Morin. TCDT includes emergency egress training and a simulated launch countdown, and is held at KSC prior to each Space Shuttle flight. Scheduled for launch April 4, the 11-day mission will feature Shuttle Atlantis docking with the International Space Station (ISS) and delivering the S0 truss, the centerpiece-segment of the primary truss structure that will eventually extend over 300 feet
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. -- Waiting his turn at driving the M-113 armored personnel carrier is STS-110 Mission Specialist Lee Morin. The driving is part of Terminal Countdown Demonstration Test activities, which include emergency egress training and a simulated launch countdown. The TCDT is held at KSC prior to each Space Shuttle flight. Scheduled for launch April 4, the 11-day mission will feature Shuttle Atlantis docking with the International Space Station (ISS) and delivering the S0 truss, the centerpiece-segment of the primary truss structure that will eventually extend over 300 feet
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. - STS-110 Mission Specialists Lee Morin and Rex Walheim look up at the S0 Integrated Truss Structure, part of the payload on their mission to the International Space Station. Crew members are at KSC for Terminal Countdown Demonstration Test activities that include the payload familiarization and a simulated launch countdown. Mission STS-110 is scheduled for launch April 4.
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. -- The STS-110 crew poses for a photo after landing at the KSC Shuttle Landing Facility. Standing left to right are Mission Specialists Steven Smith, Jerry Ross, Lee Morin, Ellen Ocho and Rex Walheim; Pilot Stephen Frick; and Commander Michael Bloomfield. Mission STS-110 is the 13th assembly flight to the International Space Station. During four planned spacewalks, crew members will install the S0 Integrated Truss Structure (ITS), centerpiece of the orbiting International Space Station (ISS), at the center of the 10-truss, girderlike structure that will ultimately extend the length of a football field on the ISS. The S0 truss will be attached to the U.S. Lab, "Destiny," on the 11-day mission
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. -- STS-110 Mission Specialist Lee Morin undergoes final check of his launch and entry suit. Morin will be taking his first Shuttle flight. The STS-110 payload includes the S0 Integrated Truss Structure (ITS), the Canadian Mobile Transporter, power distribution system modules, a heat pipe radiator for cooling, computers and a pair of rate gyroscopes. The 11-day mission is the 13th assembly flight to the ISS and includes four spacewalks to attach the S0 truss to the U.S. Lab Destiny. Launch is scheduled for April 4
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. -- STS-110 Mission Specialist Lee Morin arrives at the KSC Shuttle Landing Facility to prepare for launch April 4. The mission will be his first Space Shuttle flight. Mission STS-110 is the 13th assembly flight to the International Space Station. During four planned spacewalks, crew members will install the S0 Integrated Truss Structure (ITS), centerpiece of the orbiting International Space Station (ISS), at the center of the 10-truss, girderlike structure that will ultimately extend the length of a football field on the ISS. The S0 truss will be attached to the U.S. Lab, "Destiny," on the 11-day mission
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. -- After landing at the KSC Shuttle Landing Facility to prepare for launch April 4, the STS-110 crew pauses for a photo and a few words to the media. Standing left to right are Mission Specialists Steven Smith, Jerry Ross, Lee Morin, Ellen Ocho and Rex Walheim; Pilot Stephen Frick; and Commander Michael Bloomfield at the microphone. Mission STS-110 is the 13th assembly flight to the International Space Station. During four planned spacewalks, crew members will install the S0 Integrated Truss Structure (ITS), centerpiece of the orbiting International Space Station (ISS), at the center of the 10-truss, girderlike structure that will ultimately extend the length of a football field on the ISS. The S0 truss will be attached to the U.S. Lab, "Destiny," on the 11-day mission
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, STS-110 crew members look over the payload bay of Atlantis during Crew Equipment Integration Test activities, which include familiarization with the vehicle and payload. From left are Mission Specialist Jerry Ross, a technician, and Mission Specialist Lee Morin. The mission, 13th assembly flight to the International Space Station, includes the Integrated Truss Structure S0. The ITS S0 is the center segment on the Space Station, part of the 300-foot (91-meter) truss attached to the U.S. Lab. By assembly completion, four more truss segments will attach to either side of the S0 truss. STS-110 is scheduled to launch April 4, 2002
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, STS-110 Mission Specialists Jerry Ross (upper right) and Lee Morin (lower right) check out the payload bay of Atlantis during Crew Equipment Integration Test activities, which include familiarization with the vehicle and payload. . The mission, 13th assembly flight to the International Space Station, includes the Integrated Truss Structure S0. The ITS S0 is the center segment on the Space Station, part of the 300-foot (91-meter) truss attached to the U.S. Lab. By assembly completion, four more truss segments will attach to either side of the S0 truss. STS-110 is scheduled to launch April 4, 2002
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
1-16 of 16