REFINE 

Browse All : Images by Michael Massimino

1-20 of 20
SM4 EVA astronauts examine a flight tool container
SM4 EVA astronauts exam...
NASA
9/26/08
 
Year 2008
Group photo of the 1996 ASCAN class
Group photo of the 1996...
 
Landing of Space Shuttle Atlantis / STS-125 Mission
Landing of Space Shuttl...
05/24/09
 
Landing of Space Shuttle Atlanis / STS-125 Mission
Landing of Space Shuttl...
05/24/09
 
Landing of Space Shuttle Atlanis / STS-125 Mission
Landing of Space Shuttl...
05/24/09
 
STS-125 Crew Members head for Launch Pad 39A
STS-125 Crew Members he...
05/11/09
 
STS-125 Crew Members head for Launch Pad 39A
STS-125 Crew Members he...
05/11/09
 
STS-125 Crew Members head for Launch Pad 39A
STS-125 Crew Members he...
05/11/09
 
STS-125 Crew prepares to board the Space Shuttle Atlantis
STS-125 Crew prepares t...
05/11/09
 
STS-109 Preflight Training Activities
STS-109 Preflight Train...
06/22/01
 
Year 2001
Official Photo of Mike Massimino
Official Photo of Mike ...
09/24/2001
nasa
 
Year 2001
Official Photo of Mike Massimino
Official Photo of Mike ...
09/24/2001
nasa
 
Year 2001
SM3B: Mission to Hubble
SM3B: Mission to Hubble
Columbia
Michael Massimino
 
Media Type Image
KENNEDY SPACE CENTER, Fla. - Members of the STS-109 crew look over the interior of orbiter Columbia's payload bay. At right is Mission Specialist Michael Massimino; next to him is Commander Scott Altman. The crew is at KSC to take part in Crew Equipment Interface Test activities that include familiarization with the orbiter and equipment. The goal of the mission is to service the HST, replacing Solar Array 2 with Solar Array 3, replacing the Power Control Unit, removing the Faint Object Camera and installing the Advanced Camera for Surveys, installing the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and installing New Outer Blanket Layer insulation on bays 5 through 8. Mission STS-109 is scheduled for launch Feb. 14, 2002
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, Fla. -- STS-109 Mission Specialist Michael Massimino practices on equipment that will be used on the mission. The crew is at KSC to take part in Crew Equipment Interface Test activities that include familiarization with the orbiter and equipment. The goal of the mission is to service the HST, replacing Solar Array 2 with Solar Array 3, replacing the Power Control Unit, removing the Faint Object Camera and installing the Advanced Camera for Surveys, installing the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and installing New Outer Blanket Layer insulation on bays 5 through 8. Mission STS-109 is scheduled for launch Feb. 14, 2002
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. - Near the bunker at the bottom of Launch Pad 39A, the STS-109 crew takes part in slidewire basket/emergency egress training. In the slidewire basket are (left to right) Commander Scott Altman and Mission Specialists Michael Massimino and Nancy Currie. The training is part of Terminal Countdown Demonstration Test activities that include a simulated countdown at the pad. Columbia is scheduled to be launched Feb. 28 on mission STS-109, a Hubble Servicing Mission. The goal of the mission is to replace Solar Array 2 with Solar Array 3, replace the Power Control Unit, remove the Faint Object Camera and install the ACS, install the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and install New Outer Blanket Layer insulation. . The launch will be the first for Columbia after returning from California where it underwent extensive maintenance, inspections and enhancements. More than 100 upgrades make Columbia safer and more reliable than ever before
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. -- As part of Terminal Countdown Demonstration Test activities, the STS-109 crew practices emergency exit from the Shuttle. Leading the way to the slidewire basket is Mission Specialist James Newman, followed by Michael Massimino and Richard Linnehan. The TCDT also includes a simulated launch countdown. STS-109 is a Hubble Space Telescope Servicing Mission, with goals to replace Solar Array 2 with Solar Array 3, replace the Power Control Unit, remove the Faint Object Camera and install the Advanced Camera for Surveys (ACS), install the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and install New Outer Blanket Layer insulation. The 11-day mission will require five spacewalks to perform the tasks. Launch of STS-109 aboard Space Shuttle Columbia is scheduled for Feb. 28, 2002
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. - STS-109 Mission Specialist Michael Massimino is ready to practice driving the M-113 armored personnel carrier, part of emergency egress training at the launch pad. Behind him is Commander Scott Altmann. Crew members are taking part in Terminal Countdown Demonstration Test activities, which also include a simulated launch countdown. STS-109 is a Hubble Space Telescope Servicing Mission, with goals to replace Solar Array 2 with Solar Array 3, replace the Power Control Unit, remove the Faint Object Camera and install the Advanced Camera for Surveys (ACS), install the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and install New Outer Blanket Layer insulation. The 11-day mission will require grasping the satellite with a robotic arm in order for the crew to perform the tasks during five spacewalks. Launch of STS-109 aboard Space Shuttle Columbia is scheduled for Feb. 28, 2002
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. - STS-109 Mission Specialist Richard Linnehan is ready to practice driving the M-113 armored personnel carrier, part of emergency egress training at the launch pad. Behind him is Mission Specialist Michael Massimino. Crew members are taking part in Terminal Countdown Demonstration Test activities, which also include a simulated launch countdown. STS-109 is a Hubble Space Telescope Servicing Mission, with goals to replace Solar Array 2 with Solar Array 3, replace the Power Control Unit, remove the Faint Object Camera and install the Advanced Camera for Surveys (ACS), install the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and install New Outer Blanket Layer insulation. The 11-day mission will require grasping the satellite with a robotic arm in order for the crew to perform the tasks during five spacewalks. Launch of STS-109 aboard Space Shuttle Columbia is scheduled for Feb. 28, 2002
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. -- As part of Terminal Countdown Demonstration Test activities, the STS-109 crew practices emergency exit from the Shuttle. Seated in the slidewire basket at the 195-foot level of the Fixed Service Structure are Mission Specialists Richard Linnehan (reaching for the release lever), Michael Massimino and James Newman. The TCDT also includes a simulated launch countdown. STS-109 is a Hubble Space Telescope Servicing Mission, with goals to replace Solar Array 2 with Solar Array 3, replace the Power Control Unit, remove the Faint Object Camera and install the Advanced Camera for Surveys (ACS), install the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and install New Outer Blanket Layer insulation. The 11-day mission will require five spacewalks to perform the tasks. Launch of STS-109 aboard Space Shuttle Columbia is scheduled for Feb. 28, 2002
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
1-20 of 20