REFINE 

Browse All : Images by Paul Lockhart

1-41 of 41
Group photo of the 1996 ASCAN class
Group photo of the 1996...
 
STS-111 and Expedition 5 Emergency Egress Training
STS-111 and Expedition ...
10/16/01
 
Year 2001
STS-111 and Expedition 5 Emergency Egress Training
STS-111 and Expedition ...
10/16/01
 
Year 2001
STS-111 and Expedition 5 Emergency Egress Training
STS-111 and Expedition ...
10/16/01
 
Year 2001
STS-111 and Expedition 5 Emergency Egress Training
STS-111 and Expedition ...
10/16/01
 
Year 2001
STS-111 and Expedition 5 Emergency Egress Training
STS-111 and Expedition ...
10/16/01
 
Year 2001
STS-111 and Expedition 5 Emergency Egress Training
STS-111 and Expedition ...
10/16/01
 
Year 2001
STS-111 and Expedition 5 Emergency Egress Training
STS-111 and Expedition ...
10/16/01
 
Year 2001
STS-111 and Expedition 5 Emergency Egress Training
STS-111 and Expedition ...
10/16/01
 
Year 2001
STS-111 & Expedition 5 Emergency Egress Training
STS-111 & Expedition 5 ...
10/16/01
 
Year 2001
STS-111 & Expedition 5 Emergency Egress Training
STS-111 & Expedition 5 ...
10/16/01
 
Year 2001
STS-113 crew portrait
STS-113 crew portrait
2002
 
KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, STS-111 Pilot Paul Lockhart inspects the window of Endeavour's cockpit. He and other crew members are taking part in a Crew Equipment Interface Test in preparation for launch. Mission STS-111 will carry to the International Space Station the Multipurpose Logistics Module (MPLM), filled with experiment racks and three stowage and resupply racks, and the Mobile Base System (MBS), which will attach to the Mobile Transporter and complete the Canadian Mobile Servicing System, or MSS. The Station's mechanical arm will then have the capability to "inchworm" from the U.S. Lab to the MSS and travel along the truss to work sites on the Station. Launch of Endeavour on mission STS-111 is scheduled for May 30, 2002
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. -- STS-111 Pilot Paul Lockhart poses for the camera before taking his turn at driving the M-113 armored personnel carrier during emergency egress training at the pad. The training is part of Terminal Countdown Demonstration Test activities at KSC. The TCDT also includes a simulated launch countdown. Known as Utilization Flight -2, the mission includes attaching a Canadian-built mobile base system to the International Space Station that will enable the Canadarm2 robotic arm to move along a railway on the Station's truss to build and maintain the outpost. The crew will also replace a faulty wrist/roll joint on the Canadarm2 as well as unload almost three tons of experiments and supplies from the Italian-built Multi-Purpose Logistics Module Leonardo. Launch of Space Shuttle Endeavour on mission STS-111 is scheduled for May 30, 2002
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. -- STS-111 Pilot Paul Lockhart arrives at KSC aboard a T-38 jet aircraft to take part in Terminal Countdown Demonstration Test (TCDT) activities, along with the Expedition 5 crew, for launch of mission STS-111. Expedition 5 will travel on Space Shuttle Endeavour to the International Space Station as a replacement crew for Expedition 4. The TCDT is a rehearsal for launch and includes emergency egress training, familiarization with payload and a simulated launch countdown. Mission STS-111 is a utilization flight that will deliver equipment and supplies to the Station. Along with the Multi-Purpose Logisitics Module Leonardo, the payload includes the Mobile Base System, part of the Canadian Mobile Servicing System, or MSS, and an Orbital Replacement Unit, the replacement wrist/roll joint for the SSRMS (Canadarm2). Launch of Endeavour is scheduled for May 30, 2002
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. -- STS-111 Paul Lockhart waves after getting into his launch and entry suit. The mission crew, plus the Expedition 5 crew, are taking part in Terminal Countdown Demonstration Test activities, which includes a simulated launch countdown. Mission STS-111 is known as Utilization Flight 2, carrying supplies and equipment in the Multi-Purpose Logistics Module Leonardo to the International Space Station. The payload also includes the Mobile Base System, which will be installed on the Mobile Transporter to complete the Canadian Mobile Servicing System, or MSS, and a replacement wrist/roll joint for Canadarm 2. The mechanical arm will then have the capability to "inchworm" from the U.S. Lab Destiny to the MSS and travel along the truss to work sites. Expedition 5 will travel to the Station on Endeavour as the replacement crew for Expedition 4, who will return to Earth aboard the orbiter. Launch is scheduled for May 30, 2002
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. -- During emergency egress training at the pad, Expedition 5 member Peggy Whitson, STS-111 Pilot Paul Lockhart and Expedition 5 Commander Valeri Korzun look over the slidewire basket area. The training for the two crews is part of Terminal Countdown Demonstration Test activities, which also include a simulated launch countdown. Mission STS-111 is known as Utilization Flight 2, carrying supplies and equipment in the Multi-Purpose Logistics Module Leonardo to the International Space Station. The payload also includes the Mobile Base System, which will be installed on the Mobile Transporter to complete the Canadian Mobile Servicing System, or MSS, and a replacement wrist/roll joint for Canadarm 2. The mechanical arm will then have the capability to "inchworm" from the U.S. Lab Destiny to the MSS and travel along the truss to work sites. Expedition 5 will travel to the Station on Endeavour as the replacement crew for Expedition 4, who will return to Earth aboard the orbiter. Launch is scheduled for May 30, 2002
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. - STS-111 Pilot Paul Lockhart sits in the T-38 jet aircraft for his return to Houston. The STS-111 and Expedition 5 crews have completed Terminal Countdown Demonstration Test activities that include emergency egress training and a simulated launch countdown. Expedition 5 will travel to the International Space Station on mission STS-111 as the replacement crew for Expedition 4, who will return to Earth aboard the orbiter. Mission STS-111 is known as Utilization Flight 2, carrying supplies and equipment in the Multi-Purpose Logistics Module Leonardo to the International Space Station. The payload also includes the Mobile Base System, which will be installed on the Mobile Transporter to complete the Canadian Mobile Servicing System, or MSS, and a replacement wrist/roll joint for Canadarm 2. The mechanical arm will then have the capability to "inchworm" from the U.S. Lab Destiny to the MSS and travel along the truss to work sites. Launch is scheduled for May 30, 2002
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. -- STS-111 Pilot Paul Lockhart arrives at KSC to prepare for launch. Mission STS-111, known as Utilization Flight 2, is carrying supplies and equipment to the International Space Station. The payload includes the Multi-Purpose Logistics Module Leonardo, the Mobile Base System, which will be installed on the Mobile Transporter to complete the Canadian Mobile Servicing System, or MSS, and a replacement wrist/roll joint for Canadarm 2. The mechanical arm will then have the capability to "inchworm" from the U.S. Lab Destiny to the MSS and travel along the truss to work sites. Also on board will be Expedition 5, traveling to the Station on Space Shuttle Endeavour as the replacement crew for Expedition 4, who will return to Earth aboard the orbiter. Launch is scheduled for May 30, 2002
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. - At the KSC Shuttle Landing Facility, STS-111 Pilot Paul Lockhart climbs out of the T-38 jet aircraft that he flew from Houston to prepare for launch. Mission STS-111, known as Utilization Flight 2, is carrying supplies and equipment to the International Space Station. The payload includes the Multi-Purpose Logistics Module Leonardo, the Mobile Base System, which will be installed on the Mobile Transporter to complete the Canadian Mobile Servicing System, or MSS, and a replacement wrist/roll joint for Canadarm 2. The mechanical arm will then have the capability to "inchworm" from the U.S. Lab Destiny to the MSS and travel along the truss to work sites. Also on board will be Expedition 5, traveling to the Station on Space Shuttle Endeavour as the replacement crew for Expedition 4, who will return to Earth aboard the orbiter. Launch is scheduled for May 30, 2002
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. -- STS-111 Pilot Paul Lockhart is helped with his glove during suit check, part of pre-launch activities. The mission, known as Utilization Flight 2, is carrying supplies and equipment to the Station. The payload includes the Multi-Purpose Logistics Module Leonardo, the Mobile Base System, which will be installed on the Mobile Transporter to complete the Canadian Mobile Servicing System, or MSS, and a replacement wrist/roll joint for Canadarm 2. The mechanical arm will then have the capability to "inchworm" from the U.S. Lab Destiny to the MSS and travel along the truss to work sites. Also part of the mission, Expedition 5 will travel to the International Space Station as the replacement crew for Expedition 4, who will return to Earth aboard the orbiter. Launch is scheduled for May 30, 2002
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. - STS-111 Pilot Paul Lockhart waits for his helmet during suitup for the scheduled liftoff of Space Shuttle Endeavour at 7:44 p.m. EDT. This is Lockhart's first Shuttle flight. STS-111 is the second Utilization Flight to the International Space Station, carrying the Multi-Purpose Logistics Module Leonardo, the Mobile Base System (MBS), and a replacement wrist/roll joint for the Canadarm 2. The MBS will be installed on the Mobile Transporter to complete the Canadian Mobile Servicing System, or MSS. In addition, Expedition 5 is traveling on mission STS-111 to the International Space Station to replace the current resident crew, Expedition 4, who will return to Earth with the STS-111 crew
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. - STS-111 Pilot Paul Lockhart suits up again for the second launch attempt aboard Space Shuttle Endeavour on mission STS-111 to the International Space Station. This is Lockhart's first Shuttle flight. This mission marks the 14th Shuttle flight to the Space Station and the third Shuttle mission this year. Mission STS-111 is the 18th flight of Endeavour and the 110th flight overall in NASA's Space Shuttle program. On mission STS-111, astronauts will deliver the Leonardo Multi-Purpose Logistics Module, the Mobile Base System (MBS), and the Expedition Five crew to the Space Station. During the seven days Endeavour will be docked to the Station, three spacewalks will be performed dedicated to installing MBS and the replacement wrist-roll joint on the Station's Canadarm2 robotic arm. Endeavour will also carry the Expedition 5 crew, who will replace Expedition 4 on board the Station. Expedition 4 crew members will return to Earth with the STS-111 crew. Liftoff is scheduled for 5:22 p.m. EDT from Launch Pad 39A
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. - STS-111 Pilot Paul Lockhart steps down from the Astrovan outside the crew quarters at the Operations and Checkout Building after returning from Space Shuttle Endeavour at Launch Pad 39A. The launch of STS-111 was scrubbed due to poor weather at KSC. STS-111 is the second Utilization Flight to the International Space Station, carrying the Multi-Purpose Logistics Module Leonardo, the Mobile Base System (MBS), and a replacement wrist/roll joint for the Canadarm 2. Also on board will be the Expedition Five crew who will replace Expedition Four on the Station. Launch is rescheduled for May 31 at 7:22 p.m. EDT
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. -- STS-111 Pilot Paul Lockhart gets his helmet checked during suitup for the second launch attempt aboard Space Shuttle Endeavour on mission STS-111 to the International Space Station. This is Lockhart's first Shuttle flight. This mission marks the 14th Shuttle flight to the Space Station and the third Shuttle mission this year. Mission STS-111 is the 18th flight of Endeavour and the 110th flight overall in NASA's Space Shuttle program. On mission STS-111, astronauts will deliver the Leonardo Multi-Purpose Logistics Module, the Mobile Base System (MBS), and the Expedition Five crew to the Space Station. During the seven days Endeavour will be docked to the Station, three spacewalks will be performed dedicated to installing MBS and the replacement wrist-roll joint on the Station's Canadarm2 robotic arm. Endeavour will also carry the Expedition 5 crew, who will replace Expedition 4 on board the Station. Expedition 4 crew members will return to Earth with the STS-111 crew. Liftoff is scheduled for 5:22 p.m. EDT from Launch Pad 39A
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. -- In the White Room on Launch Pad 39A, STS-113 Pilot Paul Lockhart is helped by Danny Wyatt (foreground) with his launch and entry suit before entering Space Shuttle Endeavour. Wyatt is the NASA Quality Assurance specialist with the Closeout Crew. The launch will carry the Expedition 6 crew to the Station and return the Expedition 5 crew to Earth. The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss. Three spacewalks are planned to install and activate the truss and its associated equipment. Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 23 at 7:50 p.m. EST.
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. -- STS-113 Pilot Paul Lockhart checks the cockpit window from inside Endeavour. The check is part of Crew Equipment Interface Test activities, which include familiarization with equipment for the mission. The primary payloads on mission STS-113 are the first port truss segment, P1 Truss, to be attached to the central truss segment, S0, on the International Space Station, and the Crew and Equipment Translation Aid (CETA) Cart B that can be used by spacewalkers to move along the truss with equipment. Once delivered, the P1 truss will remain stowed until flight 12A.1. The mission will also deliver the Expedition 6 crew to the Station and return Expedition 5 to Earth. Space Shuttle Endeavour is scheduled to launch Nov. 10 on the 11-day mission.
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. -- STS-113 Pilot Paul Lockhart arrives at KSC for Terminal Countdown Demonstration Test activities, which include a simulated launch countdown. The primary payloads on mission STS-113 are the first port truss segment, P1, and the Crew and Equipment Translation Aid (CETA) Cart B. Once delivered, the P1 truss will remain stowed until flight 12A.1 in 2003 when it will be attached to the central truss segment, S0, on the Space Station. Also onboard Space Shuttle Endeavour will be the Expedition 6 crew who will replace Expedition 5, returning to Earth after 4 months. The STS-113 launch is scheduled for Nov. 10, 2002. .
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. -- STS-113 Pilot Paul Lockhart stands inside an M-113 armored personnel carrier he is about to drive, part of emergency egress training during Terminal Countdown Demonstration Test activities. He and the rest of the crew are preparing for the mission aboard Space Shuttle Endeavour, which is scheduled to launch Nov. 10. The TCDT includes a simulated launch countdown. The primary payloads on mission STS-113 are the first port truss segment, P1, and the Crew and Equipment Translation Aid (CETA) Cart B. Once delivered, the P1 truss will remain stowed until flight 12A.1 in 2003 when it will be attached to the central truss segment, S0, on the Space Station. Also onboard Space Shuttle Endeavour will be the Expedition 6 crew who will replace Expedition 5, returning to Earth after 4 months.
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. - STS-113 Pilot Paul Lockhart arrives at the KSC Shuttle Landing Facility to get ready for launch. STS-113 is the 16th American assembly flight to the International Space Station. The primary mission is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth. The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss. Three spacewalks are planned to install and activate the truss and its associated equipment. Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 11 between midnight and 4 a.m. EST.
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. -- STS-113 Paul Lockhart adjusts his helmet during suitup before launch. Lockhart will be making his second Shuttle flight. The primary mission is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth. The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss. Three spacewalks are planned to install and activate the truss and its associated equipment. Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for Nov. 11 at 12:58 a.m. EST.
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. -- STS-113 Mission Specialist John B. Herrington (left) and Pilot Paul Lockhart shake hands following their arrival at KSC's Shuttle Landing Facility to prepare for launch. STS-113 is the 16th American assembly flight to the International Space Station. The primary objective of the mission is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth. The major task of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss. Three spacewalks are planned to install and activate the truss and its associated equipment. Launch of Space Shuttle Endeavour on mission STS-113 is targeted for no earlier than Nov. 22 between 7 and 11 p.m. EST.
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. -- STS-113 Pilot Paul Lockhart gives a thumbs up following his arrival at KSC's Shuttle Landing Facility to prepare for launch. STS-113 is the 16th American assembly flight to the International Space Station. The primary objective of the mission is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth. The major task of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss. Three spacewalks are planned to install and activate the truss and its associated equipment. Launch of Space Shuttle Endeavour on mission STS-113 is targeted for no earlier than Nov. 22 between 7 and 11 p.m. EST.
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. - STS-113 Pilot Paul Lockhart salutes as he finishes suiting up for a second launch attempt on mission STS-113. The launch on Nov. 22 was scrubbed due to poor weather conditions at the Transoceanic Abort Landing sites. Lockhart will be making his second Shuttle flight. The launch will carry the Expedition 6 crew to the Station and return the Expedition 5 crew to Earth. The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss. Three spacewalks are planned to install and activate the truss and its associated equipment. Launch of Space Shuttle Endeavour on mission STS-113 is now scheduled for Nov. 23 at 7:50 p.m. EST.
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
KENNEDY SPACE CENTER, FLA. -- STS-113 Pilot Paul Lockhart shows thumbs up for launch as he finishes suiting up. Lockhart will be making his second Shuttle flight. The primary mission for the crew is bringing the Expedition 6 crew to the Station and returning the Expedition 5 crew to Earth. The major objective of the mission is delivery of the Port 1 (P1) Integrated Truss Assembly, which will be attached to the port side of the S0 truss. Three spacewalks are planned to install and activate the truss and its associated equipment. Launch of Space Shuttle Endeavour on mission STS-113 is scheduled for 8:15 p.m. EST.
KENNEDY SPACE CENTER, F...
No copyright protection...
NASA or National Aerona...
 
STS-111 Shuttle Mission...
2004-04-03 0:0:0
 
Description KSC-02PD-0887 (06/05/2002) --- KENNEDY SPACE CENTER, FLA. -- The STS-111 and Expedition 5 crews hurry from the Operations and Checkout Building for a second launch attempt aboard Space Shuttle Endeavour. From front to back are Pilot Paul Lockhart and Commander Kenneth Cockrell; Astronaut Peggy Whitson; Expedition 5 Commander Valery Korzun (RSA) and Cosmonaut Sergei Treschev (RSA); and Mission Specialists Philippe Perrin (CNES) and Franklin Chang-Diaz. This mission marks the 14th Shuttle flight to the Space Station and the third Shuttle mission this year. Mission STS-111 is the 18th flight of Endeavour and the 110th flight overall in NASA's Space Shuttle program. On mission STS-111, astronauts will deliver the Leonardo Multi-Purpose Logistics Module, the Mobile Base System (MBS), and the Expedition Five crew to the Space Station. During the seven days Endeavour will be docked to the Station, three spacewalks will be performed dedicated to installing MBS and the replacement wrist-roll joint on the Station's Canadarm2 robotic arm. Endeavour will also carry the Expedition 5 crew, who will replace Expedition 4 on board the Station. Expedition 4 crew members will return to Earth with the STS-111 crew. Liftoff is scheduled for 5:22 p.m. EDT from Launch Pad 39A.
STS-111 Shuttle Mission...
2004-04-03 0:0:0
 
Description KSC-02PD-0896 (06/05/2002) --- KENNEDY SPACE CENTER, FLA. -- Photographers gather near the turn basin in the Launch Complex 39 Area as Space Shuttle Endeavour roars into space on mission STS-111 to the International Space Station. Liftoff occurred at 5:22:49 p.m. EDT. The STS-111 crew includes Commander Kenneth Cockrell, Pilot Paul Lockhart, and Mission Specialists Franklin Chang-Diaz and Philippe Perrin (CNES), as well as the Expedition Five crew members Valeri Korzun, Peggy Whitson and Sergei Treschev. This mission marks the 14th Shuttle flight to the International Space Station and the third Shuttle mission this year. Mission STS-111 is the 18th flight of Endeavour and the 110th flight overall in NASA's Space Shuttle program.
STS-111 Shuttle Mission...
2004-04-03 0:0:0
 
Description KSC-02PD-0899 (06/05/2002) --- KENNEDY SPACE CENTER, FLA. -- The light at the end of a stem of smoke is Space Shuttle Endeavour as it hurtles into space on mission STS-111 to the International Space Station. Liftoff occurred at 5:22:49 p.m. EDT. The STS-111 crew includes Commander Kenneth Cockrell, Pilot Paul Lockhart, and Mission Specialists Franklin Chang-Diaz and Philippe Perrin (CNES), as well as the Expedition Five crew members Valeri Korzun, Peggy Whitson and Sergei Treschev. This mission marks the 14th Shuttle flight to the International Space Station and the third Shuttle mission this year. Mission STS-111 is the 18th flight of Endeavour and the 110th flight overall in NASA's Space Shuttle program.
STS-111 Shuttle Mission...
2004-04-03 0:0:0
 
Description KSC-02PD-0900 (06/05/2002) --- KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour erupts from billows of smoke and steam as it hurtles into space on mission STS-111 to the International Space Station. Liftoff occurred at 5:22:49 p.m. EDT. The STS-111 crew includes Commander Kenneth Cockrell, Pilot Paul Lockhart, and Mission Specialists Franklin Chang-Diaz and Philippe Perrin (CNES), as well as the Expedition Five crew members Valeri Korzun, Peggy Whitson and Sergei Treschev. This mission marks the 14th Shuttle flight to the International Space Station and the third Shuttle mission this year. Mission STS-111 is the 18th flight of Endeavour and the 110th flight overall in NASA's Space Shuttle program.
STS-111 Shuttle Mission...
2004-04-03 0:0:0
 
Description KSC-02PD-0902 (06/05/2002) --- KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour clears the lightning mast as it hurtles into space on mission STS-111 to the International Space Station. Liftoff occurred at 5:22:49 p.m. EDT. The STS-111 crew includes Commander Kenneth Cockrell, Pilot Paul Lockhart, and Mission Specialists Franklin Chang-Diaz and Philippe Perrin (CNES), as well as the Expedition Five crew members Valeri Korzun, Peggy Whitson and Sergei Treschev. This mission marks the 14th Shuttle flight to the International Space Station and the third Shuttle mission this year. Mission STS-111 is the 18th flight of Endeavour and the 110th flight overall in NASA's Space Shuttle program.
Exploration Imagery
2007-11-21 0:0:0
 
Description JSC2007-E-102624 (14 Nov. 2007) --- NASA, the National Science Foundation and ILC Dover unveiled an Antarctic-bound inflatable habitat (seen here in the background) on Nov. 14, at ILC's facility in Frederica, Del. Speakers included (from the left) Paul Lockhart, director of the Constellation Systems Division in NASA's Exploration Systems Mission Directorate; Erick Chiang of the National Science Foundation; and Larry Toups, habitat lead for NASA's Constellation Program Lunar Surface Systems Office. The habitat, being developed under NASA's Innovative Partnership Program, will be put through its paces as a component of the McMurdo Station in Antarctica from January 2008 through February 2009. Using reports from explorers braving this harsh environment and data collected from habitat sensors, designers will evaluate the concept of using inflatable structures to support future explorers on the moon or Mars.
1-41 of 41